28th Ave NW – Adams ES Neighborhood Greenway

Updated September 2025

What's Happening Now?

In 2024, we temporarily paused work while we identified the funding necessary to complete project construction. We still plan to build these neighborhood greenway improvements and hope to have more information on our project schedule later this year. We will continue to share updates on our webpage, in email updates, and with flyers or signs distributed to the community.  

Sign up for our project listserv to receive updates and construction notifications. 

Project Overview

This Neighborhood Greenway has been planned in coordination with the Safe Routes to School Program and will provide a safer, more comfortable route for people walking and biking to Adams Elementary School. The planned Neighborhood Greenway route also connects to the existing Neighborhood Greenway on NW 58th Ave and will include the following safety enhancements:

  • Stop signs with stop bars on side streets intersecting the Neighborhood Greenway
  • Speed humps or cushions to calm traffic
  • 20 mph speed limit signs
  • No parking signs 20 feet from intersections
  • Minor crack sealing and patch repair with asphalt
  • Tree trimming and sidewalk smoothing
  • Wayfinding signs and markings

28th Ave NW Route Map

Proposed Intersection Improvements

NW 65th St & 26th Ave NW

Painted bulb at the existing school-marked crosswalk to block off the no-parking area, visually narrow the street, and highlight the school crossing to motorists

Satellite image of NW 65th St & 26th Ave NW intersection showing where new pavement markings will go

NW 65th St at 28th Ave NW

  • Install a second school-marked crosswalk on the east leg, which is the side the school is on.
  • Painted bulb at school-marked crosswalks to block off the no-parking area, visually narrow the street, and highlight the school crossing to motorists
  • Adams ES students voted on their favorite design from a list of pre-approved SDOT designs. The winning design was the mountain design below.

Satellite image of NW 65th St & 28th Ave NW intersection showing where new pavement markings will go

Graphic image showing snow-covered mountains

Materials

Transportation

Adiam Emery, Interim Director
Address: 700 5th Ave, Suite 3800, Seattle, WA, 98104
Mailing Address: PO Box 34996, Seattle, WA, 98124-4996
Phone: (206) 684-7623
684-Road@seattle.gov

Newsletter Updates

Subscribe

Sign up for the latest updates from Transportation

The Seattle Department of Transportation (SDOT) is on a mission to deliver a transportation system that provides safe and affordable access to places and opportunities for everyone as we work to achieve our vision of Seattle as a thriving, equitable community powered by dependable transportation.