Historical Plans and Documents
Historical plans and documents that were shared on the original website during construction:
Art Plan
Foundational Design Plans
- Concept Design July 2012
- Framework Plan July 2012
- Strategic Plan July 2012
- Design Summary July 2012
Operations and Maintenance
- Waterfront Seattle Operations and Maintenance Report July 2018
- Waterfront Seattle Operations and Maintenance Report November 2015
Seattle Design Commission Presentations
- Design Commission, Sustainability and Wayfinding November 2014
- Waterfront Program Wayfinding Master Plan November 2014
- Design Commission, Tribal Presence on the Seattle Waterfront January 2015
- Design Commission, Arts and Culture on the Seattle Waterfront January 2015
- Design Commission, Tribal Presence on the Seattle Waterfront January 2015
- Design Commission, Pier 62 July 2016
- Design Commission 90% Main Corridor Design December 2017
- Design Commission 90% Main Corridor Design - Continuous Elements December 2017
- Design Commission, Tribal Presence on the Seattle Waterfront November 2018
- Design Commission 90% Union Street September 2019
- Design Commission Marion Street Pedestrian Bridge January 2020
- Design Commission 90% Overlook Walk November 2020
- Design Commission 90% Pier 58 July 2021
- Design Commission 90% Pike Pine Streetscape and Bicycle Improvements February 2022
- Design Commission 60% Restroom Design March 2023
- Design Commission 60% Bell Street October 2023
Brochures
- Waterfront Seattle brochure (English) June 2023
- Waterfront Seattle brochure (Somali) June 2023
- Waterfront Seattle brochure (Spanish) June 2023
- Waterfront Seattle brochure (Simplified Chinese) June 2023
- Waterfront Seattle brochure (Vietnamese) June 2023
- Sea Level Rise Information November 2013
Environmental Documents
In accordance with the Washington State Environmental Policy Act (SEPA), the City of Seattle has completed evaluation of the potential impacts to the natural and built environment that could result from the planned improvements to the waterfront.
- Alaskan Way, Promenade & Overlook Walk - Final EIS Executive Summary
- Alaskan Way, Promenade & Overlook Walk - Full Final EIS
- Seawall SEIS in Focus
- Seawall SEIS Executive Summary
- Pike Pine Streetscape and Bicycle Improvements Project SEPA
- Pike Pine Streetscape and Bicycle Improvements - Determination of Nonsignificance
- Waterfront Park - Determination of Nonsignificance
- Pioneer Square East West Pedestrian Improvements Project - Determination of Nonsignificance
- Pier 58 SEPA Checklist
Washington Landings Materials
- Revised Pre-Concept Plan July 2021
- Design Study 2019
- Design Summary October 2015
- Informational Displays June 2015
- Presentation March 2015
Other Documents
- Washington Street Boat Landing Restoration Project September 2016